From the Star – Pertamina, PETRONAS

September 17, 2009

Dateline 2009-09-12 taken from the Star:

(PT) Pertamina and partner PETRONAS Carigali Overseas Sdn Bhd, a unit of Petroliam National Bhd., won the rights to jointly develop West Glagah Kambuna block of the coast of Sumatra…

Star - Pertamina PETRONAS

Star - Pertamina PETRONAS

Hey, a sign of cooperation during these trying times for Malaysia-Indonesia relationships (I blame the Discovery Channel).

You can subscribe to an online version of the paper at the Bluehyppo site, follow links to e-browse.

And Patrick Swayze passed away this week.


Saturday Star 2009-09-12 – Job Opportunities

September 14, 2009
  • First off, Synergy is looking for 5 lead safety engineers and 3 lead process engineers. Visit the Synergy website for contact details. And safety specialists. Ah, heck. If you have more than 5 years experience in O&G, apply. If you have less than 5, send a donation to the offshore account, and still get abuse.
  • I see AP Recruitment has a full page spread. Must be the start of booming times in Qatar. The are usually associated with Qatar Petroleum and Qatar Gas. Wonder why the don’t mention their client here? Anyhow, jobs are available for Maint Eng (Electrical), Planning Engineering Specialist (Shutdown). The rest are technician posts. Apply here.
  • Shapadu is recruiting for Mech & Piping, Elect & Instr, Planning, Structural & Construction, Comm Eng. Email here or here. I know these guys as an offshore construction group, though I tend to pay attention to who actually works for a company rather than the company name. That’s the nature of construction contracts, if the PSC likes you personally, then you swap coveralls and work for the PSC’s flavour of the month.
  • And Kebabangan Petroleum Operating Company (KPOC to friends) has a two-page spread. I presume they are now moving into detailed design / fabrication? Anyhow, the posts that they hope to fill are: Offshore Installation Manager (OIM, PIC, Platform Supv), Snr Proj Eng, Snr Proj Eng (Mat & Eqpt), Electrical Reliability Eng (is TNB offshore?), C&I Reliability Eng, Snr Contract Specialist (this is where you make your money by, ahem, creative means), Metering System Reliability Eng (not many of them around), Piping Eng, Mech Reliability Eng, LQ project eng (please don’t make it dorm style), Proj Eng, Planning Eng, Cost Eng). Please apply here, or snail mail to: Kebabangan Petroleum Operating Comp Sdn Bhd, Level 52, Tower 2, PETRONAS Twin Towers, KLCC, 50088 KL, Malaysia.

No makan-makan recommendations this week. I did have an iftar at the Bluewave Hotel, Shah Alam though.


Optimal – A Fully PETRONAS Company

September 9, 2009

I can’t find this news on any Malaysian news site. I first read about it in the TCE:

TO further ease its debts, Dow Chemical has agreed to sell its stake in Optimal to Malaysian partner Petronas for $660m.

 I pulled an extract from Project Finance International (subscribers only):

Dow has recently sold its entire stake in Malaysia-based Optimal Group of Companies to Petroliam Nasional (PETRONAS).

From Optimal’s history page, there are only two investors, UCC (now part of DOW) and PETRONAS.

I remember when Optimal was sucking up the Kerteh workforce with higher pay and better compensation. They opened up an international school in Kerteh, to cater for the (highly paid) expats who came in for the first 2 years. They also closed the school when the expats left, so you know it wasn’t meant as a service to local staff, even those who could afford it.

So, does this mean that the current Optimal salary, wages and benefits (SWB) will be in line with the rest of PETRONAS? Is there going to be an exodus of talent from Optimal to … don’t think there are other high-paying jobs around the KIPP (Kawasan Industry Petroliam PETRONAS), so we’ll see another exodus overseas.


Saturday Star 2009-09-05 – Job Opportunities

September 7, 2009
  • Petrofac is looking for a reservoir engineer. Send you application here.
  • Talisman is looking for a Team Lead – Exploration Dept. Apply here, and visit their site.

Latest food site? I had iftar at Selero Negori, Subang.


Saturday Star 2009-08-22 – Job Opportunities

August 24, 2009

First of all, I would like to say: Ramadhan Mubarak.

  • First off, Synergy is looking for 5 lead safety engineers and 3 lead process engineers. Visit the Synergy website for contact details. And safety specialists. Ah, heck. If you have more than 5 years experience in O&G, apply. If you have less than 5, send a donation to the offshore account, and still get abuse.
  • SGS (not Shell Global Solutions, which is a whole other article) is looking for a flow assurance engineer. Send your application here.

For this week, I would suggest eating at Sindbad’s, a Middle Eastern restaurant located on the East Wing, Subang Square Business Park, SS15.


IEM OGMTD – Drilling Seminar

August 20, 2009

The Oil, Gas and Mining Technical Division of the IEM hosted a one day ‘Drilling Engineering Overview’ seminar on August 5, 2009. It was conducted by Mr. Abdul Razak Yakob and held at the Wisma IEM, attracting 21 participants.

Razak started out with an icebreaking session with the participants, enquiring as to their backgrounds and what the participants wanted to get out of the course.

He then kicked off his seminar with an overall background to the topic. He described the differences between onshore and offshore drilling, and presented photos of various drilling rigs available in the market. He introduced the rig management structure, showing a slide summarizing the various personnel manning the drilling operations.

Razak then discussed the different mechanical parts that make up the drilling equipment, whether on the rig floor or the support peripherals. Among the different equipment that were described was the Christmas tree, drill bit, drilling fluids, casing and cementing. An introduction to interpretation of logging results formed a part of the seminar, giving the participants a taste of analyzing well data. To provide some feel as to the information technology involved in drilling, the software suites used for data management, engineering and facilities integration was shown.

He then moved on to describe the well life cycle stages, which is construction, implementation, analysis and improvement.

Razak introduced the participants to the economical side of the operations, showing some shocking numbers. He then scared the living daylights out of us by providing some insight into the hazards associated with drilling.

Directional drilling was the next topic of the day.

A quick overview of drilling analysis was provided.  Participants were reminded of their undergraduate statics courses, where force balances, and torque plays an important part of the analysis.

Casing design was touched upon. This section covered the types of casing integrated into a well, and design considerations.  The importance of a correct cement job was discussed, as well as the analytical tests  to ensure the cement has the correct properties for the job.

Last but not least was more detail into the drilling fluids, and the required properties for different types of jobs.

The participants were from a mix, covering well grounded engineers who wanted to network and share experiences, to water wellbore engineers looking to see how different types of drilling technologies may be applicable to similar circumstances. And it is always a delight to see Razak in full flow.


Safety Notice – MLNG fatality

August 18, 2009

Strange I have to go to an overseas website to get the news. It was reported by Bernama as well.

At the Malaysian Liquefied Natural Gas plant in Tanjung Kidurong, Sarawak, 3 workers were overcome by gas while inspecting a large gas pipeline there, 1 of them has died, the condition of the other 2 in hospital remains unknown. 5th August 2009.


Saturday Star 2009-08-15 – Job Opportunities

August 17, 2009
  • First off, Synergy is looking for 5 lead safety engineers and 3 lead process engineers. Visit the Synergy website for contact details. And safety specialists. Ah, heck. If you have more than 5 years experience in O&G, apply. If you have less than 5, send a donation to the offshore account, and still get abuse.
  • Siemens “I won’t sell the future for quick profits” is looking for a Sales Manager, AP and Bid Manager, AP, presumably looking for some kind of profit. Send email here or apply via the website.
  • QP, ever dependable QP, is looking for a Maintenance Planning Engineer, Head Tech Support, Mech Eng, Rot Eng. Send email here, or visit the QP website. Did I tell you that QP’s SWB (salary, wages, benefits) package is something to be sneezed at?

Hmm, no particular place to recommend this week. So, let’s go back to the ever faithful Chee Meng’s. Last fling before Ramadhan?


From The Star – Transpeninsular Pipeline

August 16, 2009

Dateline 2009-08-13 taken from the Star:

The US$7bil Transpeninsular Pipeline (TPP) project that was to take off nearly two years ago may yet become a reality as a Chinese party is said to be keen to take a stake in the project with a shareholding agreement expected to be signed as early as tomorrow.

Malaysia - Transpeninsular Pipeline

Malaysia - Transpeninsular Pipeline

Maybe Synergy can propose doing the flow assurance for this pipeline… nah, it’s single phase, any university student who stayed awake during the compressible flow lectures should be able to do this.

You can subscribe to an online version of the paper at the Bluehyppo site, follow links to e-browse.


Operator Training Simulators – Intro and Marketing

August 13, 2009

Here’s a little something that I wrote,

you might want to play it note for note…

Enough 80s already.

Operator Training Simulators

Operator Training Simulators (OTS) train operators on fundamental plant operations and improve their ability to optimize plant performance with the same simulation tool. OTS mirrors the exact look and feel of a plant, captures operator best practices, provides a standardized, level training ground to evaluate operator performance and enables operators to exercise best practices.

Sample - Condensate Stabilizer OTS

Sample - Condensate Stabilizer OTS

The model is capable of simulating the following operations:

  • Start-up operations
  • Normal steady-state operations
  • Normal shutdown operations
  • Emergency shutdown operations.

In addition to the above operations, the system is capable of simulating operations dictated by process disturbances and equipment failures introduced by the instructor.

The core element of any training simulator system is the simulation model of the plant unit operations and process controls. The UniSim system provides the ability to construct simulation model without computer programming knowledge by providing a library of building block modules used for simulating the behavior of devices such as pumps, columns, heat exchangers, valves, compressors, vessels and DCS control points. Major equipment types vary significantly from one plant to another. This variability is not generally in the overall functionality of the equipment, but in specific details such as geometry, configuration details, piping, service, etc. This variability greatly affects the operation of the equipment and hence the dynamic simulation of that operation.

Honeywell USO

Honeywell USO

The approach used in the UniSim system is to model the operation of such equipment using modules that are more fundamental. These modules contain a mathematical engineering model (based on first principles of chemical engineering) of the equipment type including heat, material and momentum balances, thermodynamic and operating equations, both algebraic and differential. Each equipment types can be further defined using equipment parameters that customise the module to reflect the actual operating and physical characteristics of the device.

The Instructor Station (I/S) is the control center of the simulator. The I/S allows access to the simulator’s special features, which do not exist at the actual site. These include:

  • RUN, FREEZE and RESUME execution of the process model and control system representation in a completely time synchronized manner.
  • SAVE and RESTORE model states for future retrieval.
  • EXECUTE the model FASTER or SLOWER than real time.
  • Introduce malfunctions.
  • Initiate scenarios.

The I/S interface also lets the instructor monitor the progress of the training session with lists and trends of process and control system variables.

Honeywell USO

Honeywell USO