Radios and Perforation Activities

June 12, 2008

One thing I always wondered was why radio communication is banned during a perforation exercise. For those not in the know, perforation as explained by opcharlie is blasting through the production casing of a well so that hydrocarbons from the reservoir are able to make their way into the production string. Kinda like making holes in a blocked off straw so that your drink can enter the straw, and be sucked into your mouth.

Steps in perforating a production string

‘Blast’ is the correct word, as explosives are used to perforate the production casing. The triggering of the explosives is done by a remote control. There is a concern that the inadvert triggering of the explosives may be caused by radio equipment. Hence, when a perf operation is underway, no radio equipment is allowed to operate. Portable handhelds may be recalled back from personnel, and an equipment tally is performed.

What I would like to know is, how many near misses / injuries / fatalities have occured due to radio equipment triggering perf explosives? This may happen if:

  • the perf gun goes off before it enters the production string
  • permature release when it goes off before reaching the required depth.