Remember those wind turbines I mentioned last year? Unfortunately, they have stopped working. Someone please tell me that this was a commercial venture, and didn’t use my marine park entrance fee.
Remember those wind turbines I mentioned last year? Unfortunately, they have stopped working. Someone please tell me that this was a commercial venture, and didn’t use my marine park entrance fee.
This entry was posted on Sunday, May 10th, 2009 at 7:24 am and is filed under engineering, Malaysia. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Paypal donations accepted.Self Promotion. I have some copies of
Visit here for more details.
The Knowledge: How to Rebuild Civilization in the Aftermath of a Cataclysm
| Wata on Books – Young Turks, Tua… | |
| Raymond on Books – Young Turks, Tua… | |
| Wata on Books – Young Turks, Tua… | |
| IM on Books – Young Turks, Tua… | |
| Qua Kiat Seng on Not impossible to achieve net… | |
| Wata on Books – Young Turks, Tua… | |
| Nishant . on Petronas poised to power up of… | |
| Mohd hatta salleh on Books – Young Turks, Tua… | |
| Therissa on Petronas poised to power up of… | |
| Wata on Vendor Development Program | |
| tomoe Sushi on Oil and gas sector remains in… | |
| Shahmin Fadzil on Vendor Development Program | |
| http://matdepchoem.e… on Oil and gas sector remains in… | |
| Wata on Extract from “Tuah Jebat… | |
| Wata on Extract from “Tuah Jebat… |

probably caused by malaysian styled maintenance.
Dear sir/madam
This is Engineer Gh.Reza Sargolzaei, Project Manager for Wind & Solar power Plants at the South East Province of Sistan-Baluchestan city of Zahedan ( SBREC ), we are producing and distributing electricity. As we studied for almost 5 years the wind and solar power in our area we have a good receiving sun emission and also a wind speed of more than 6 m/s up to 25 m/s almost 10 months of the year.
We are looking for a partner to supply us the Wind Turbine and Solar equipments , that we have plan to install at list a Pilot wind farm minimum 100 Mw and a solar farm of 300 Kw.
Please note that I’m visiting my daughter this coming Dec that she is studying master degree of GIS at the UPM, I will be in Malaysia for 2 weeks during 13 till 27 of Dec. 2009 . If you are interested and its possible for you to give me your abilities or other companies ,please contact me so we may visit each other and talk more about our tasks.
Truly yours
Reza Sargol
Sistan – Baluchestan Regional Electric company(SBREC)
Zahedan – IR.IRAN
Mobil Tel. : 00989151430133
Tel.Fax : 00985418027205
abrahimabrahimy@yahoo.com
Eng’r. Sargol: We expect a commission upon getting an introduction. Others: caveat emptor.
i’ll keep off making smart comments today
Jabba: please continue the comments.