Remember those wind turbines I mentioned last year? Unfortunately, they have stopped working. Someone please tell me that this was a commercial venture, and didn’t use my marine park entrance fee.
Remember those wind turbines I mentioned last year? Unfortunately, they have stopped working. Someone please tell me that this was a commercial venture, and didn’t use my marine park entrance fee.
probably caused by malaysian styled maintenance.
Dear sir/madam
This is Engineer Gh.Reza Sargolzaei, Project Manager for Wind & Solar power Plants at the South East Province of Sistan-Baluchestan city of Zahedan ( SBREC ), we are producing and distributing electricity. As we studied for almost 5 years the wind and solar power in our area we have a good receiving sun emission and also a wind speed of more than 6 m/s up to 25 m/s almost 10 months of the year.
We are looking for a partner to supply us the Wind Turbine and Solar equipments , that we have plan to install at list a Pilot wind farm minimum 100 Mw and a solar farm of 300 Kw.
Please note that I’m visiting my daughter this coming Dec that she is studying master degree of GIS at the UPM, I will be in Malaysia for 2 weeks during 13 till 27 of Dec. 2009 . If you are interested and its possible for you to give me your abilities or other companies ,please contact me so we may visit each other and talk more about our tasks.
Truly yours
Reza Sargol
Sistan – Baluchestan Regional Electric company(SBREC)
Zahedan – IR.IRAN
Mobil Tel. : 00989151430133
Tel.Fax : 00985418027205
abrahimabrahimy@yahoo.com
Eng’r. Sargol: We expect a commission upon getting an introduction. Others: caveat emptor.
i’ll keep off making smart comments today
Jabba: please continue the comments.