June 4, 2019
My technical division will be hosting a 1 day course on the 4th July 2019. It is worth 6.5 CPD points, and held at Wisma IEM. The course will be presented by your’s truly, so come and heckle me.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this. This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member.
Ir. Razmahwata Bin Mohd Razalli has 20 years of experience in the oil and gas industry, in both design and operations. He joined ExxonMobil Exploration and Production Malaysia Inc shortly after graduation in 1995. In 1998, he was reassigned to EMEPMI’s operations department. His responsibility was to provide technical support to an offshore production facility. His tasks were varied, included troubleshooting day to day challenges, managing retrofit projects, and leading safety cases. He was made the Company’s custody metering engineer in 2001, charged with leading the exercise to ensure the Company compliance with industry and company specifications was enhanced. Whilst in Poyry, Ir. Razmahwata has been a Senior Process Engineer for SembCorp’s Betara project. He has HAZOP, HAZID and SIL workshop leadership experience on offshore facilities. He has recently worked on a secondment providing detailed design services to a tanker to FPSO conversion project in Singapore. He supported ExxonMobil in developing measurement manuals, and leading an exercise to validate 59,000 line items. He is currently the Lead Engineer of IGL Services Sdn Bhd.
Register here, or download the form here.
Leave a Comment » |
Malaysia, oil and gas | Tagged: IEM, IGL, razmahwata, SIL |
Permalink
Posted by Wata
May 21, 2019
My technical division will be hosting a 1 day course on the 4th July 2019. It is worth 6.5 CPD points, and held at Wisma IEM. The course will be presented by your’s truly, so come and heckle me.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this. This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member.
Ir. Razmahwata Bin Mohd Razalli has 20 years of experience in the oil and gas industry, in both design and operations. He joined ExxonMobil Exploration and Production Malaysia Inc shortly after graduation in 1995. In 1998, he was reassigned to EMEPMI’s operations department. His responsibility was to provide technical support to an offshore production facility. His tasks were varied, included troubleshooting day to day challenges, managing retrofit projects, and leading safety cases. He was made the Company’s custody metering engineer in 2001, charged with leading the exercise to ensure the Company compliance with industry and company specifications was enhanced. Whilst in Poyry, Ir. Razmahwata has been a Senior Process Engineer for SembCorp’s Betara project. He has HAZOP, HAZID and SIL workshop leadership experience on offshore facilities. He has recently worked on a secondment providing detailed design services to a tanker to FPSO conversion project in Singapore. He supported ExxonMobil in developing measurement manuals, and leading an exercise to validate 59,000 line items. He is currently the Lead Engineer of IGL Services Sdn Bhd.
Register here, or download the form here.
Leave a Comment » |
Malaysia, oil and gas | Tagged: IEM, IGL, razmahwata, SIL |
Permalink
Posted by Wata
November 1, 2016
My technical division will be hosting a 1 day seminar on the 15th November, 2016. It is worth 6.5 CPD points, and held at Hilton Hotel. Since I’m giving it, I expect hoards will have to be turned away at the gates. And it’s a big room, so I need to fill the seats.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this.
This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member. It is meant to provide both instruction and workshop sessions so that the participants:
- Are familiar with the concept of ‘risk’
- Are familiar with the theory and terminology behind Layers of Protection, SIS, SIF, SIL and LOPA
- Are familiar with the different SIL methodologies: risk graph, risk matrix, LOPA.
- Have expectations as to what the SIL workshop will (and won’t) provide.
- Understand what deliverables can be expected from a SIL workshop.
- Have the opportunity to participate in SIL exercise in a safe environment.Opportunity to share SIL experiences.
Wata has 19 years of experience in the oil and gas industry, in both design and operations.
Register here, or download the form here.
Leave a Comment » |
engineering, Malaysia, oil and gas | Tagged: course, IEM, razmahwata, SIL |
Permalink
Posted by Wata
December 31, 2015
My technical division will be hosting a 2 day seminar on the 12th January, 2016. It is worth 13 CPD points, and held at Wisma IEM. Since I’m giving it, I expect hoards will have to be turned away at the gates. And it’s a big room, so I need to fill the seats.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this.
This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member. It is meant to provide both instruction and workshop sessions so that the participants:
- Are familiar with the concept of ‘risk’
- Are familiar with the theory and terminology behind Layers of Protection, SIS, SIF, SIL and LOPA
- Are familiar with the different SIL methodologies: risk graph, risk matrix, LOPA.
- Have expectations as to what the SIL workshop will (and won’t) provide.
- Understand what deliverables can be expected from a SIL workshop.
- Have the opportunity to participate in SIL exercise in a safe environment.Opportunity to share SIL experiences.
Wata has 19 years of experience in the oil and gas industry, in both design and operations.
Register here, or download the form here.
3 Comments |
engineering, Malaysia, oil and gas | Tagged: course, IEM, razmahwata, SIL |
Permalink
Posted by Wata
December 29, 2015
My technical division will be hosting a 2 day course on the 12th and 13th January, 2016. It is worth 13 CPD points, and held at Wisma IEM. Since I’m giving it, I expect hoards will have to be turned away at the gates. And it’s a big room, so I need to fill the seats. It is two days, ignore the typo.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this.
This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member. It is meant to provide both instruction and workshop sessions so that the participants:
- Are familiar with the concept of ‘risk’
- Are familiar with the theory and terminology behind Layers of Protection, SIS, SIF, SIL and LOPA
- Are familiar with the different SIL methodologies: risk graph, risk matrix, LOPA.
- Have expectations as to what the SIL workshop will (and won’t) provide.
- Understand what deliverables can be expected from a SIL workshop.
- Have the opportunity to participate in SIL exercise in a safe environment.Opportunity to share SIL experiences.
Wata has 19 years of experience in the oil and gas industry, in both design and operations.
Register here, or download the form here.
Leave a Comment » |
Malaysia, oil and gas | Tagged: course, IEM, razmahwata, SIL |
Permalink
Posted by Wata
December 22, 2015
My technical division will be hosting a 2 day course on the 12th and 13th January, 2016. It is worth 13 CPD points, and held at Wisma IEM. Since I’m giving it, I expect hoards will have to be turned away at the gates. And it’s a big room, so I need to fill the seats. It is two days, ignore the typo.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this.
This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member. It is meant to provide both instruction and workshop sessions so that the participants:
- Are familiar with the concept of ‘risk’
- Are familiar with the theory and terminology behind Layers of Protection, SIS, SIF, SIL and LOPA
- Are familiar with the different SIL methodologies: risk graph, risk matrix, LOPA.
- Have expectations as to what the SIL workshop will (and won’t) provide.
- Understand what deliverables can be expected from a SIL workshop.
- Have the opportunity to participate in SIL exercise in a safe environment.Opportunity to share SIL experiences.
Wata has 19 years of experience in the oil and gas industry, in both design and operations.
Register here, or download the form here.
Leave a Comment » |
engineering, Malaysia, oil and gas | Tagged: course, IEM, razmahwata, SIL |
Permalink
Posted by Wata
August 19, 2015
It was the fasting month, so don’t expect a walking travelogue.
Leave a Comment » |
oil and gas | Tagged: Busan, HAZOP, SIL |
Permalink
Posted by Wata
August 11, 2015
My technical division will be hosting a 1 day seminar on the 10th Sovember, 2015. It is worth 6.5 CPD points, and held at Wisma IEM. Since I’m giving it, I expect hoards will have to be turned away at the gates. And it’s a big room, so I need to fill the seats.
In the Layer of Protection methodology, a Safety Instrumented Function (SIF) designed to eliminate the cause of a risk or minimize the consequence of an event. The expectation of the SIF’s reliability to perform upon demand must be defined so that it is designed appropriately. The Safety Integrity Level (SIL) study is a tool used this.
This full day course is designed to educate participants in the SIL process from the perspective of a SIL team member. It is meant to provide both instruction and workshop sessions so that the participants:
- Are familiar with the concept of ‘risk’
- Are familiar with the theory and terminology behind Layers of Protection, SIS, SIF, SIL and LOPA
- Are familiar with the different SIL methodologies: risk graph, risk matrix, LOPA.
- Have expectations as to what the SIL workshop will (and won’t) provide.
- Understand what deliverables can be expected from a SIL workshop.
- Have the opportunity to participate in SIL exercise in a safe environment.Opportunity to share SIL experiences.
Wata has 19 years of experience in the oil and gas industry, in both design and operations.
Register here, or download the form here.
Leave a Comment » |
engineering, Malaysia, oil and gas | Tagged: course, IEM, razmahwata, SIL |
Permalink
Posted by Wata