Taken from AOG – PETRONAS and EOR


Taking the article from the Asian Oil & Gas magazine,

Malaysia has set itself an ambitious target to add an additional 520 million barrels of oil to its reserve by 2010 by applying EOR technologies to its offshore oilfields.

According to Dr. Nasir Hj. Darman of …

Hopefully, the spill off will allow us small specialist engineering companies to soldier through these trying times. Even though most of the work is downhole, the PSCs must need to design additional topsides facilities (im thinking water injection here) to pursue their EOR of choice.

Asian Oil & Gas March/April 2009 edition

Asian Oil & Gas March/April 2009 edition

2 Responses to Taken from AOG – PETRONAS and EOR

  1. Rudisham says:

    Let’s put the multiphase pump in the picture. A sure production booster! You won’t need to inject anything! Of-course, injection + pump = much more bbls!!

  2. Jarni says:

    Agreed with Rudy. The OFSE/MPMs have already being used and proven globally.. in North Sea…China etc and the latest / planned installation in Angolan field (Nov 2010).

Leave a comment