IChemE 2nd regional safety seminar – Part II


Continuing on the same topic above, a presentation was delivered by Damain Peake, Sr Technical Safety Engineer, Shell E&P Asia Pacific entitled ‘Shell – Asia Pacific (EPA) operationalises HSE cases: major hazards communication and technical integrity’

  • Shell E&P AP portfolio.
  • Asset Integrity – Definitions
  • Technical Integrity – Definitions
  • Introduction to Safety Cases
    • Show all that hazards with the potential to cause a major accident have been identified, their risks have been evaluated and measures have been taken to control them.
  • Issues
    • Focus: SC used to capture all hazards, not just causes of major accidents.
    • Usability: SC unwieldy due to too much info.
    • Upkeep of SC, Management of Change (MOC)
    • Consistency of SC structure.
  • Framework to address Issues
  • Operationalise Shell E&P AP SCs.
    • Operating envelope and SC agreement
    • Institute maintenance schedule
    • MAH identified
    • Compliance to ALARP principles
    • Accountability
    • Remedial action plan and progress tracking
  • SC HSE section structure
    • Overview
    • Major Accident Hazards (MAH)
    • Equipment
    • Systems
    • Additional information
  • Best Practices
    • MAH and assessments
      • Best Practice Bow Tie – templates, electronically distributed and linked.
    • Hazard / Safety Critical Element (SCE) communication
      • Hazard control sheets.
      • Major accident pictures.
      • KPIs.
    • SCE and technical integrity
      • Change from facility description to SCE description
      • Describe how to keep the SCE operating.
      • Clear guidelines on how to manage SCEs when not fully functional.
  • Take home messages
    • Process safety – asset integrity (AI) intrinsically linked.
    • In operations, MAH management can only be ensured if technical integrity is ensured.
    • Operations HSE case have 3 main functions: communication, linkages, …
    • HSE lose focus.

One Response to IChemE 2nd regional safety seminar – Part II

  1. Toha says:

    can tell me the failure that can happen for the NGV vehicle. in tank,pipeline,or in engine.

Leave a comment