6,000 Equipped to Work in Oil & Gas

December 7, 2022

Isqak!!! Isqaque?

Dateline 2022-09-XX, The Star:

Johor Petroleum Development Corporation Bhd (JPDC) has produced about 6,000 skilled workers through upskilling and reskilling training programmes.

Two key initiatives – the Skills in Oil and Gas (Soga) and Bridging Gaps programmes with funding from the Economic Planning Unit (EPU) of the Prime Minister’s Department – have helped them to prepare the manpower while meeting the needs of downstream oil and gas activities at the Pengerang Integrated Petroleum Complex (PIPC) in Johor.

JPDC acting chief executive Izhar Hifnei Ismail said the figure included over 1,800 workers who had completed or were currently taking the Soga programme.


Promoting downstream oil and gas industry

October 12, 2017

Any may I complement Izhar Hifnei Ismail on his eloquence, and when will he do a photo op with me? Muar boleh!

Dateline 2017-08-31, Japan Times:

The PIPC sits on a 20,000-acre piece of land in Pengerang, in Malaysia’s Johor state. The PIPC is designed to accommodate downstream oil and gas industrial facilities such as refineries and petrochemical plants, deep-water terminal and storage tanks, naphtha crackers, regasification plants and supporting facilities, as well as manufacturing plants and industrial parks.

To be developed in phases, the PIPC covers both core and non-core downstream activities. Included in the PIPC master plan are designated areas for related support services such as a plastic and fine chemicals park, a light and medium industrial park, a waste management center, an emergency response center, a logistics hub, a commercial hub and others.

 The striking attraction of the PIPC lies in the robust design of the PIPC master plan that strives to enable and promote future growth and sustainability, by offering a wide spectrum of investment opportunities targeted at downstream oil and gas players.