From Free Malaysia Today – Dormant company gets RM5.8b LNG project

July 19, 2011

I’m dormant, why didn’t they pick me?

Dateline 2011-07-02:

The Perak DAP today lodged a report against the Barisan Nasional state government for misusing its power in awarding a RM5.8 billion project to a RM100 dormant company to import liquified natural gas (LNG) from Qatar.

The project is located in Segari, Manjung.

The report was lodged with the Malaysian Anti-Corruption Commission (MACC).

“This is a clear case of misuse of power by BN in giving this RM5.8 billion project to the RM100 dormant company named Atigas Technology Sdn Bhd,” party state deputy chief V Sivakumar said at a press conference. Also present were two other Pakatan members.

…

 


Saturday Star 2011-07-16 – Job Opportunities

July 18, 2011

Support me by purchasing my recommendations, or buying through my Amazon store. I need the money to pay for running this site. Corporate level sponsors are encouraged.

First off, if you need my help to submit your CVs, donate to the blog, and I’ll review your CV to see if it is worthy of my (and my associates’) expectations. If you can’t figure out how to donate, no need to ask.

  • I’m looking for a senior process engineer, 7+ years experience. Send your cv to the usual email address.
  • I see that Qatar Petroleum is looking for people. They are looking for Safety Technician (Fire maintenance), Safety Technician (Permit), Safety Trainer, Safety Technician (Industrial Hygiene).  Apply here.
  • Talisman is looking for a Senior Process Engineer. Apply here, and visit their site.

May I suggest that readers install the Waze app on their phones? And use it as much as possible? It says its a “a social mobile application providing free turn-by-turn navigation based on the live conditions of the road. 100% powered by users, the more you drive, the better it gets. Join the community of drivers in your area today!”

How about a selection of books on chemical plants?
  

Ludwig’s Applied Process Design for Chemical and Petrochemical Plants, Fourth Edition,Process Plants: A Handbook for Inherently Safer Design, Second Edition, Chemical Engineering Design: Principles, Practice and Economics of Plant and Process Design.


From The Star – Bumi Armada’s shares in high demand

July 17, 2011

Change ‘shouldn’t’ to ‘will pay triple for to’, remove the subsidies altogether, create a zippy (doesn’t have to be efficient) public transport network, and I’ll be happier

Dateline 2011-07-02:

A cleverly-crafted fund raising exercise, offshore oil and gas services provider Bumi Armada Bhd’s initial public offering (IPO) has created an “artificially high demand” for the company’s shares amongst institutional investors in lieu of its flotation onto the Main Market of Bursa Malaysia this month, analysts and market observes say.

Market talk has been rife that Bumi Armada’s IPO has garnered strong interest from foreign and local institutional investors, with sources disclosing that the company saw its institutional offer 5.6 times oversubscribed on the first day its bookbuilding exercise, which had commenced on June 28 and is scheduled to close next Friday before the institutional price is determined on July 11.

…

You can subscribe to an online version of the paper at the e-browse site. The site technology is a bit out of date. You have to use IE7-8 to pay for a subscription, and there is no app. How will I be able to read The Star on my Nokia N95?


From Business Times – Hibiscus Petroleum to only venture into E&P

July 16, 2011

Dateline 2011-06-30:

Hibiscus Petroleum Bhd will utilise its initial public offering (IPO) proceeds of between RM150 million and RM300 million to acquire stakes in one to three oil and gas exploration and production (E&P) companies.

“We intend to only venture into E&P opportunities, from low to moderate risk onshore opportunities and low risk shallow water offshore opportunities that have high upside potential,” said Managing Director Dr Kenneth Pereira after launching the company’s IPO prospectus here today.

Hibiscus Petroleum, the first special purpose acquisition company (SPAC) to be listed on Bursa Malaysia, is scheduled for listing on the Main Market on July 25.

…

 


From the Engineering Floor – Secret Engineering Project

July 15, 2011

Don’t know about you, but apparently there’s a research project in Wisma IEM that’s promoting inter-species communication. Maybe they thought it was easier then Mars-Venus intercourse.


Shout Out – IChemE Hazards Asia Pacific Symposium

July 14, 2011

Go attend, y’all. And mention that I pushed you their way.

Dear MOGSC members,

CICM and IChemE are organizing the 1st Hazards Asia Pacific Symposium at the Inter Continental Hotel, Kuala Lumpur on 27 – 29 September 2011. Attached is the 2nd announcement of the said symposium. This announcement contains the provisional programme and also the confirmed keynote / plenary speakers for the symposium.

Kindly circulate this information widely to your business associates / relevant persons that may be interested to participate in this symposium.

Further details of the Hazards AP could also be accessed at <http://www.icheme.org/hazardsap>

SPONSORSHIP & EXHIBITION OPPORTUNITIES are available for this 3-day event. The sponsorship proposals could be accessed at <http://www.icheme.org/~/media/Documents/Conferences/Hazards%20AP/0122_11Hazardsapsponsorsv21>

Thank you and we look forward to your support and participation.


Shout Out – Half Day Workshop on How to Assess Inherent Occupational Health in Chemical Process Plant

July 13, 2011

This is a shout out for the IEM. My Technical Division will be  hosting a seminar on the 23rd July, 2011. It’ll start at 9:00 and is worth 3.5 CPD hours. You still gotta climb those steps at Wisma IEM. They promise up that the elevator will be ready by the next AGM. And we have a member of that rarer species of lady engineers presenting the workshop.

The workshop will introduce you to the following topics:

  1. What is inherent occupational health concept and how it can be adopted during the design phase?
  2. How to assess inherent occupational health hazards at the different stages of the process design?
  3. How to quantify and characterize the risk of chemical exposure among workers?
  4. How to eliminate or reduce the health hazards in the process? What is the best design principle to be applied at the design stage?

Dr Mimi Hassim is a Senior Lecturer with Universiti Teknologi Malaysia. She is an established and world pioneer researcher working on inherent occupational health studies of chemical processes. She published more than 10 journal papers and made a lot of presentations in various conferences. She has also received the best paper award in one the important congress. Her methods have been adopted by a major chemical company in Finland.

Register here or download the form here. A map to Wisma IEM is presented here.


Shout Out – 2 Day Course on Value Base Maintenance Using Proactive Reliability Concept

July 12, 2011

This is a shout out for the IEM. My Technical Division will be  hosting a seminar on the 25th and 26th July, 2011. It’ll start at 9:00 and is worth 12.5 CPD hours. You still gotta climb those steps at Wisma IEM. They promise up that the elevator will be ready by the next AGM.

The course will discuss the importance of engineering and maintenance team to support an organization success. The basis of all maintenance activities has to be clearly defined so that the activities add value to the organization by aligning them with the vision, mission and values of the company. The concept and methodology of value creation by maintenance will be discussed with participants in an interactive manner.

Ir. Al-Khairi has a varied experienced in project, engineering, maintenance and reliability experience from various industries. Ir. Al-Khairi started his career a research assistant with Shell Research Centre in Thornton, United Kingdom in 1991. He came back to Malaysia and worked as a plant engineer with Associated Pam Malaysia Cement (APMC) Sdn Bhd, a cement plant, in Rawang, Selangor. He further developed his professional experience in oil and gas sector with Shell/PETRONAS via Malaysia LNG in Bintulu. He subsequently joined Uniqema Malaysia (an oleo-chemical plant), which is a subsidiary of Unilever and later ICI.

He went back to petrochemical plant when he became the Maintenance Manager with UCB Chemicals in 2002. His experience was enriched when he set up the facilities and equipment department with a world class Research and Development Company together with its factory set up. He then headed a similar role with a leading Medical Centre in Klang Valley prior to setting up his own consultancy company presently.

During his career, Ir. Al-Khairi has implemented various CMMS software’s such as SAP. MP2. Maintsavers and CWork. He also had won an award for his outstanding contribution on SHE excellent from ICI. Currently Ir. Al-Khairi is the Chairman of the Oil, Gas and Mining Technical Division of the Institution of Engineers Malaysia. Ir. Al-Khairi has developed an international alliance with other reliability Professionals under Uptime Alliance (see http://www.consciousasset.com and http://www.faqeh.com). Ir. Al-Khairi’s objective is to let the industry benefits from world class maintenance and reliability practices.

Register here or download the form here. A map to Wisma IEM is presented here.


Saturday Star 2011-07-09 – Job Opportunities

July 11, 2011

Support me by purchasing my recommendations, or buying through my Amazon store. I need the money to pay for running this site. Corporate level sponsors are encouraged.

First off, if you need my help to submit your CVs, donate to the blog, and I’ll review your CV to see if it is worthy of my (and my associates’) expectations. If you can’t figure out how to donate, no need to ask.

  • JX Nippon Oil & Gas Exploration (Malaysia) Ltd is looking for manager (supplies & logistics), manager (resource assessment), manager (project), snr reservoir engineer, snr structural & marine engineer,  rotating equipment engineer, project engineer. Snail mail to Human Resource Section, JX NIPPON OIL & GAS EXPLORATION (MALAYSIA) LTD, Lot 1168, 3rd Floor, Wisma Interhill, Miri Waterfront Commercial Centre, 98000 Miri, Sarawak, Malaysia before 16th May, 2011. Hey, some of these positions were advertised in April. 2011.
  • Murphy is looking for a senior deepwater drilling eng, snr deepwater completion engineer, deepwater drilling foreman, senior production engineer. Apply here.
  • ConocoPhillips is looking for a Planning Manager, Planning Engineer, Process Engineer. Apply here.

May I suggest that readers install the Waze app on their phones? And use it as much as possible? It says its a “a social mobile application providing free turn-by-turn navigation based on the live conditions of the road. 100% powered by users, the more you drive, the better it gets. Join the community of drivers in your area today!”

How about a selection of books on chemical plants?
  

Ludwig’s Applied Process Design for Chemical and Petrochemical Plants, Fourth Edition,Process Plants: A Handbook for Inherently Safer Design, Second Edition, Chemical Engineering Design: Principles, Practice and Economics of Plant and Process Design.


Anniversary – Seveso Disaster

July 10, 2011

Process Safety Engineers never forget.