Setback at ChemOne’s US$5.3 bil Pengerang project, sources say


Dateline 2025-11-17, The Edge Malaysia:

A proposed downstream petrochemicals facility to be developed by Singapore-based ChemOne Group in Pengerang, Johor, is experiencing a setback in achieving financial close, sources say, due to potential cost escalation on the part of its construction partner.

The US$5.32 billion (RM22.3 billion) project is considered one of the handful of major investments in the Pengerang Integrated Petroleum Complex (PIPC), Malaysia’s largest petrochemicals hub.

Leave a comment