Xodus to design Petronas’ first CCS facility


Doesn’t PETROS need to approve this?

Dateline 2021-08-17, The Chemical Engineer:

PETRONAS has awarded energy consultancy Xodus the conceptual engineering design contract for the state-energy firm’s first complete CCS project.

Xodus will conduct the feasibility studies and conceptual design for the CCS system for Kasawari, a sour gas field off the coast of Sarawak. The contract was won as part of Xodus’ contract with Petronas to provide engineering services for its Malaysian and international developments. Kasawari is scheduled to begin injecting captured CO2 in 2025, and has been billed by Malaysia’s state energy company as the world’s largest offshore CCS project. The field is estimated to have recoverable reserves of around 3 trn ft3 of gas.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: