Dateline 2019-07-24, Offshore:
Hibiscus Petroleum has drilled and completed SJ‐105A, the first of three wells for the St Joseph infill drilling project in the North Sabah enhanced oil recovery PSC offshore Malaysia.
The SJ‐105A wellbore was drilled as a horizontal well comprising around 2,400 ft (731 m) of horizontal section which encountered 1,000 ft (305 m) of oil in the targeted reservoirs.
…