Tapis EOR jacket en route for installation


Dateline 2013-07-05, Daily Express:

ExxonMobil Exploration and Production Malaysia Inc (EMEPMI), a subsidiary of Exxon Mobil Corporation, together with Petronas Carigali Sdn Bhd have successfully completed the construction and loadout of its platform jacket for the first large-scale Enhanced Oil Recovery (EOR) project in the region.

The eight-legged jacket – a tall, steel structure that rises up from the ocean to support a surface deck – is now en route to be installed at the Tapis field, located about 200km offshore Terengganu.

“The 5,500-tonne jacket is the substructure for the main central processing facility of the EOR project. Built in Lumut, it’s the heaviest jacket that we have installed in Malaysia,” Project Executive Douglas C. Smith told Bernama in an exclusive interview.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: