ETP: Economy to be driven by large infrastructure projects


Ah, MPRC. Dateline 2013-03-19 from the Star:

The Gumusut-Kakap field, which recorded its first oil production in Nov 2012, is expected to reach a maximum of 25,000 barrels per day (bpd) after ramping up two wells.

Located in offshore Sabah as Malaysia’s second deepwater development, the field’s full development comprises 19 subsea wells, a permanent semi-submersible floating production system with a potential to produce a maximum of 120,000 bpd.

As one of the entry point projects under the Oil & Gas National Key Economic Area, the production is an achievement after a 14-month planning and execution process.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: