Murphy contracts McDermott for deepwater Malaysia oil development Mc


How do I get in touch with Berlian  McDermott? How big is their cubicle in Regis?

Dateline 2012-05-09:

McDermott International Inc. (NYSE: MDR) subsidiary Berlian McDermott Sdn Bhd has won a contract for subsea engineering, procurement, construction, transportation, installation, and commissioning in deepwater offshore Malaysia.

The subsea infrastructure work is on Murphy Sabah Oil Co. Ltd’s Siakap North – Petai development and covers rigid flowlines, flexible risers, an umbilical, and subsea hardware and controls. Siakap is northwest of Labuan Island in waters 3,900 – 4,900 ft (1,189 – 1,494 m) deep.

Field architecture consists of two rigid, insulated, pipe-in-pipe production flowlines, one rigid water injection flowline, and one main umbilical connecting eight new manifolds and subsea distribution units to existing riser slots on the Kikeh FPSO. The development calls for five water injection and eight production wells, drilled from the manifolds at each of the four drill centers.

4 Responses to Murphy contracts McDermott for deepwater Malaysia oil development Mc

  1. Sallehuddin Omar says:

    You can check MOGSC directory. They are a member

  2. Sallehuddin Omar says:

    Got it right. They are based in Wisma Selangor Dredging as per MOGSC directory

Leave a comment